Noise levels are medium to high in the Library today as the concrete floor on Level 5 is cut for the lift shaft. It is most noisy on Level 4.
June 21, 2009 - June 27, 2009
This page provides a weekly view of the events that occurred or are planned for the week: June 21, 2009 - June 27, 2009.
The Lev2/Lev3 feature walls on the East wing are finished and there is water in the reflection pool – being rain water it’s not very reflective, but it does give an idea of how it will eventually look. The edge planks are all in place so the steel work for the ‘curtain walling’ (i.e. the windows) can now begin.
The scaffolding all over the East Wing is for safety to prevent workers from falling off, in case you were wondering...
COllection notes: Last week the rare book collection from NZC was relocated to LB.06.