Today we are planning to empty Level 2 by the end of the day ready to hand over to FCC.
The top line of fins is being installed on the East Wing front - do have a look because it is a spectacular sight (we will put a photograph on flickr)
Today we are planning to empty Level 2 by the end of the day ready to hand over to FCC.
The top line of fins is being installed on the East Wing front - do have a look because it is a spectacular sight (we will put a photograph on flickr)
Page Generated: Fri Feb 10 17:44:45 2012
URL: http://www.waikato.ac.nz/library/construction/2010/01/changes-to-library-level-2.shtml
This page has been reformatted for printing
Leave a comment